Skip to main content

Back to portfolio

Signal House, Kingston Road

Project
Signal House, Kingston Road
Partner
Angelo Gordon
Scale
278 Student Rooms
Location
Wimbledon, SW19
Construction
Insitu RC to 1F with PCC Cladding and full Pre-Cast Concrete frame to upper floors
Type
Partnership

Signal House, Wimbledon - 278-bed Purpose-Built Student Accommodation, Kingston Road, Wimbledon

Signal House is a newly completed 278-bed PBSA development on Kingston Road, Wimbledon, delivered in partnership with Angelo Gordon. The scheme has transformed 0.64 acres of brownfield land into a high-quality residential community for students, ready for the new academic year.

The development is exceptionally well-connected, situated within easy reach of multiple London universities and colleges, with tram links providing swift access to Wimbledon, Croydon and beyond.

The scheme also includes a 275m² commercial unit and public realm improvements, contributing positively to the wider Kingston Road streetscape and local community.

Amenities

Signal House has been designed to support every aspect of student life, with an exceptional range of on-site facilities. Residents can unwind in the dedicated cinema room, grab a coffee at the breakfast bar or socialise in the landscaped courtyard. For those who like to keep active, the state-of-the-art gym comes fully equipped with cardio machines and weights, while the games lounge, complete with pool table and table tennis, offers a more relaxed way to recharge.

When it comes to studying, the dedicated study lounge provides spaces for both solo and collaborative working. The bookable theatre kitchen is perfect for private dining and entertaining, and smart laundry facilities with app-based booking make day-to-day living effortless. Air conditioning is provided throughout all en-suite rooms and cluster kitchens, ensuring comfort year-round.

default

Amenity Area

Construction - Start to Finish!

From demolition in September 2024 to completion in August 2026, watch the transformation of Signal House, Wimbledon. Built in just two years, it was ready in time for the new 2026 academic year!

Thumb image

Next